Floods are natural events; therefore, we cannot do without them completely.
Societies built their cities in the flood plain and put themselves in harm's way.
The 100-yr flood is used for design.
This implies the possibility of a flood larger than 100-yr recurrence interval.
Ultimate flood control design uses the equivalent of 10,000-yr recurrence interval
[the PMP and associated PMF].
The 100-yr design flood is a working number [four generations].
It implies the possibility of having to rebuild the flood-control infrastructure approximately every four generations.