CIVE 445 - ENGINEERING HYDROLOGY
SPRING 2010 - MIDTERM 2 - SOLUTION
|
To convolute the 2-hr unit hydrograph with the effective storm pattern defined at intervals of 3 hr, it is necessary to change the unit
hydrograph duration to 3 hr. We use the S-hydrograph method to change the 2-hr UH to 3-hr UH.
To calculate the flood hydrograph, for 3 cm, it is 3 times; for 6 cm, it is 6 times (lagged 3 hr).
Time | 2-hr UH | 2-hr SH
|
Lagged 3 hr | 3-hr UH | 3×UH | 6×UH (lagged 3 hr) | Composite Flood hydrograph
|
(hr) | (m3/s) | (m3/s)
|
(m3/s) | (m3/s) | (m3/s) | (m3/s) | (m3/s)
|
0 | 0 | 0 |
0 | 0.00 | 0 | 0 | 0
| 1 | 5 | 5 |
0 | 3.33 | 10 | 0 | 10
| 2 | 15 | 15 |
0 | 10.00 | 20 | 0 | 30
| 3 | 30 | 35 |
0 | 23.33 | 70 | 0 | 70
| 4 | 60 | 75 |
5 | 46.67 | 140 | 20 | 160
| 5 | 70 | 105 |
15 | 60.00 | 180 | 60 | 240
| 6 | 60 | 135 |
35 | 66.67 | 200 | 140 | 340
| 7 | 55 | 160 |
75 | 56.67 | 170 | 280 | 450
| 8 | 45 | 180 |
105 | 50.00 | 150 | 360 | 510
| 9 | 35 | 195 |
135 | 40.00 | 120 | 400 | 520
| 10 | 25 | 205 |
160 | 30.00 | 90 | 340 | 430
| 11 | 15 | 210 |
180 | 20.00 | 60 | 300 | 360
| 12 | 5 | 210 |
195 | 10.00 | 30 | 240 | 270
| 13 | 0 | 210 |
205 | 3.33 | 10 | 180 | 190
| 14 | 0 | 210 |
210 | 0.00 | 0 | 120 | 120
| 15 | 0 | 210 |
210 | 0.00 | 0 | 60 | 60
| 16 | 0 | 210 |
210 | 0.00 | 0 | 20 | 20
| 17 | 0 | 210 |
210 | 0.00 | 0 | 0 | 0
∑ | 420 | - |
- | 420.00 | 1260 [= 420×3] | 2520
[= 420×6] | 3780
[= 420×9]
| |
Problem 3
|