SPRING 2011 - MIDTERM 2 - SOLUTION
Drainage area = 43 ha Rainfall intensity = 26 mm/hr Runoff coefficient = 0.75 Peak discharge Qp = 0.75 × 26 mm/hr × 43 ha Qp = 0.75 × 26 mm/hr × 0.001 m/mm × (1/3600) hr/s × 43 ha × 10,000 m2/ha Qp = 2.329 m3/s ANSWER. Problem 2 110405
Rainfall intensity = 26 mm/hr
Runoff coefficient = 0.75
Peak discharge Qp = 0.75 × 26 mm/hr × 43 ha
Qp = 0.75 × 26 mm/hr × 0.001 m/mm × (1/3600) hr/s × 43 ha × 10,000 m2/ha
Qp = 2.329 m3/s ANSWER. Problem 2